Time

Multiple Days

Complexity

Advanced

Introduction

This project is made from cedar posts and dimensional lumber placed over a timber, concrete and patio stone base. It’s a challenge to build, but if you’ve built a deck, you can handle this. The pavilion will take you about two full weekends to build. Beauty doesn’t come cheap, though; expect to pay about $1500 for everything with a bit more for your personal landscaping touches.

Tools Required

  • 12-in. Speed Square
  • 4 ft. level
  • Chain saw
  • Chalk line
  • Circular saw
  • Framing square
  • Hacksaw
  • Hammer
  • Handsaw
  • Shovel
  • Sledgehammer
  • Socket wrench
  • Tape measure
  • Trowel
  • Utility knife
  • Wheelbarrow

Materials Required

  • 1/2” nuts (24)
  • 1/2” threaded rod 36” long (6)
  • 1/2” washer (56)
  • 1×1 patio pavers (12)
  • 10d galv. common nails (10 lbs.)
  • 12” spike nails (16)
  • 16d galv. common nails (2 lbs.)
  • 2×2 patio pavers (12)
  • 2×4 x 8’ pine (1)
  • 2×6 x 10’ cedar hip rafters (4)
  • 2×6 x 7’ cedar common rafters (4)
  • 2×6 x 7’ cedar stringers (4)
  • 2×6 x 8’ cedar jack rafters (4)
  • 2×8 x 12’ cedar fascia (4)
  • 2×8 x 8’ cedar beams (8)
  • 3” x 1/2” concrete anchors (12)
  • 3” x 1/2” lag screws (24)
  • 3” x 3” x 1/4” steel angle (1)
  • 3d galv. box nails (10 lbs.)
  • 5-1/2” x 5-1/2” x 10” treated timbers (6)
  • 5” x 1/2” lag screws (8)
  • 5/4 x 6 x 12’ cedar roof decking (30)
  • 6” x 6” x 8’ cedar posts (12)
  • 60-lb. bags of sand (4)
  • 62” long
  • 8d galv. common nails (8 lbs.)
  • Cedar roof cap (40)
  • Cubic yard concrete (1)
  • Roll of roofing felt (1)
  • Sheet of 3/4” plywood (1/2)
  • Squares of No. 2 cedar shingles @ 200 sq. ft. (2)
  • Wood stakes (4)

Project step-by-step (9)

Step 1

Outdoor pavilion plans

Figure A

How To Build A Post And Beam Pavilion MainTMB Studio

Figure B- Typical Platform Cross Section

How To Build A Post And Beam Pavilion Typical Platform Cross SectionTMB Studio

Figure C

How To Build A Post And Beam Pavilion Outdoor pavilion plans overviewTMB Studio

Figure D- Hip Rafters

How To Build A Post And Beam Pavilion Hip RaftersTMB Studio

Figure E- Common Rafters

How To Build A Post And Beam Pavilion Common RaftersTMB Studio

Figure F- Jack Rafters

How To Build A Post And Beam Pavilion Tfhgazebo,rafters6 Graphic Grid Callouts Jack RaftersTMB Studio

Figure G

How To Build A Post And Beam Pavilion Outdoor pavilion plansTMB Studio

Site details

The pavilion’s patio base is easier to build if you have a level site. Uneven sites must be built up on the low side with extra landscape timbers.

To construct the patio, you’ll have to remove the turf with a sod cutter or shovel, then do a bit of digging. Our site has clay soil, which doesn’t drain well, so we added a few inches of sand beneath the timbers to drain away excess moisture. If your soil drains well, you can just dig to the thickness of the timbers and pour the 3/4-in. concrete base between the timbers, right over the undisturbed soil.

Step 2

Getting started with outdoor pavilion plans

After you choose a site, pound stakes into the ground 11 feet apart to establish your digging area. To make sure your staked area is square, just measure the diagonals. They must be equal to have a square perimeter. Stakes and string always seem to get in the way, so mark the turf with spray marking paint, which is available at hardware stores.

Dig out the turf to a level depth of 5-1/2 in. Cut timbers to the dimensions in the Materials List. (We used an electric chain saw, but a circular saw followed by a handsaw will do just fine.) Then spike them together at the corners.

  • Pro tip: It’s best to stand on the timber you’re driving the spike into. It keeps the timbers from moving each time the sledge meets the spike.

Spike the outside perimeter together first, then the inner. After the timbers are joined, square the outside frame (remember, the diagonal measurements must be equal), then the inside frame. To make sure all the timbers are level and the inner frame is level with the outer frame, set a 4 ft. level along each timber. A bit of soil placed under the low sections will level them.

Before continuing, make sure the inside frame is 24-1/4 inches inside the outer frame on each side. Tamp a bit of soil around the timbers to hold them in place. You can also drive some wood stakes along the outside of each timber frame to keep it in position while you pour concrete. Now’s the time to prepare the pier forms for each corner as shown in the Figure A, so they’re ready when you pour the concrete.

A person wearing a red long-sleeve shirt, blue jeans, and brown shoes is bent over, spray-painting lines on a grassy area marked by string tied to four yellow stakes. The person appears to be creating a rectangular outline on the grass.TMB STUDIO

Lay out an 11-ft. square area with marking paint. The area will be a bit larger than the patio to allow some elbow room to spike the timbers. Dig out the turf with a shovel or sod cutter to a depth of 5-1/2 inches. If you have a low spot on any side, you may need extra timbers to level the area.

Connect the timbers with 12-in. spike nails at each corner. Build the exterior perimeter first, then the inner. Our soil was mostly clay, so we dug a bit deeper and laid the timbers over 2 in. of sand for better drainage.

A person is assembling a wooden structure on a patch of dirt within a grassy area. They are using a hammer to secure the wood pieces together. There are extra wooden blocks on the grass nearby, and trees can be seen in the background.TMB STUDIO

Step 3

Pouring concrete

You’ll need a bit less than 1 cubic yard of concrete to fill the inside of the timbers to a depth of 3-1/4 inches. That would be over 50 bags of dry concrete mix! Hand mixing would wear your palms to the bone and fix your back in a permanent bend. So call a ready-mix company and have them deliver 1 cu. yd. of concrete (about $90). This is a bit more than you need, but it’s worth having extra. To get the right concrete mixture, just tell them you’re pouring a sidewalk, and they’ll send out the appropriate stuff.

Have a wheelbarrow or two ready, along with a couple of extra string backs when the truck pulls up. Pour the concrete into the forms and have a 2×4 ready to screed (smooth) the surface. The notches in the 2×4 screed are 2-1/4 inches deep. This will give you room for sand to level the patio stones after the concrete is set. Next, screw the pier forms to the timbers.

Fill the pier forms with concrete as soon as the area inside of the timber frame is poured and leveled. The concrete in the piers needs to bond with the concrete underneath, so work fast. A hot, dry day will give you only about an hour or less of working time, so don’t get sidetracked. The piers are the only part that has to work nice, so save the trowel work for them.

A person wearing a red shirt and blue jeans is leveling concrete within a wooden frame using a green tool. A red wheelbarrow is nearby on a grassy area. The background features a green lawn and partial shade.TMB STUDIO

Screed the concrete 2-1/4 inches below the top of the timbers on the inside of both timber frames. Don’t worry about getting the surface smooth because later, you’ll put a layer of sand over the hardened concrete to level the patio pavers.

Install the forms for the piers on each corner while the concrete below is still moist. Shovel a firm mixture of concrete into the forms and use a trowel to smooth it. The concrete can be shaped easily with a towel on the open sides of the forms.

A person is using a tool to spread concrete inside a wooden frame. There's a green square mold within the frame, and a trowel in the worker's hand. The frame is placed on grass, partially filled with gravel or concrete mix.TMB STUDIO

Step 4

Installing the patio pavers

The next day, you’ll find the concrete hard enough to lay the patio pavers. You can buy these at most home centers or patio supply stores. Check the thickness of your pavers before you buy. Our pavers were a bit under 2 inches thick so we needed to level about 3/8 inch of sand (all-purpose or play sand from your home center) over the concrete as a bed for them. Make another screed with a notch cut that is the same thickness as your pavers. Pour in the sand and pull the screed board across the timbers to even the sand over the concrete. Next, lay the pavers in place as shown in the Figs. A and B. We selected two colors to complement the pavilion, but you can design your own pattern.

You may need to level some of the corners of the patio stones further. Just lift the paver and add or remove sand as needed. If your patio ended up a bit out of square, you may have to cut the edges of some pavers to make them fit. If so, use a masonry blade for your circular saw, put on some goggles and gloves, and trim the edges.

A man in a red shirt and blue jeans kneels on the ground while fitting pavers and pea gravel into a wooden grid framework. A blue bucket with sand is next to him, and the work is taking place on a grassy lawn.TMB STUDIO

After spreading a thin layer of sand over the concrete, lay the patio stones in place. Sprinkle handfuls of sand to level the stones with the tops of the timbers.

Outline the post locations by tracing around the end cuts of the posts. Be sure you place the outer edges of the inner post 78 inches apart to get the right locations to conform with the beams above. This is crucial for the roof framing to align. Allow a 3-inch space between the inner and outer columns.

Person kneeling on ground using a measuring tape and a pencil to measure between two wooden blocks on concrete slabs, with additional construction materials around.TMB STUDIO

Step 5

Making the steel post supports

We made our 2 x 3 x 1/4-in. steel supports from a length of steel angle we purchased from a welding shop. You can cut the 5-in. lengths with an aluminum oxide metal-cutting blade placed in your circular saw, but it’s easier to have the welding shop cut them to length for you. Most shops have a shear that easily cuts the steel angle. It’ll probably cost about $1 per cut.

You can either drill the 9/16-in. holes in the post supports yourself, or if you don’t like working with metal, have the welding shop do the drilling, too. If you do it yourself, use a heavy-duty electric drill. Start with a 1/4-in. hole, then enlarge it with a 9/16-in. bit. Be sure to clamp the supports in a vise to keep them from moving as you drill. Use a little motor oil on the bit as you drill to keep the bit cool.

When you’re done drilling the holes, file any sharp edges and clean the metal with mineral spirits. Spray paint the supports with two coats of rust-inhibiting paint.

Drill into the concrete piers to fasten the steel brackets made from 3 x 3-in. steel angle. The 1/2-in. concrete anchors grip the concrete as the nuts are tightened.

A person in a red shirt and blue jeans is using a power drill on a concrete base with metal brackets. Nearby on the ground are a hammer, screws, and a wrench. The scene is set outdoors on a lawn area.TMB STUDIO

Step 6

Fastening the posts

Cut the cedar posts to length, then use the cut-off ends to help you lay out the locations for the steel supports. The posts should be 78 inches from the edges of the inner posts on each corner, as shown in Figure B. Mark the edges of each post location and the hole locations of the supports with a pencil. Drill 1/2-in. holes into the concrete to accept the concrete anchor bolts. This type of anchor is designed to grip the concrete as you tighten the nut. Drive the anchor bolts into the holes with a hammer, install the support, washer and nut and tighten the nut with a wrench.

While a helper holds each post against each steel support, drill 3/8-in. pilot holes through the support into the post for the 3 x 1/2-in. lag screws. Use a wrench to tighten the lag screws. Complete only two sides as shown in Photo 8.

After clamping each beam to the posts, fasten it in place. The bolts are made from 1/2-in. threaded rods, and the beams are made from two 2×8 cedar boards.

A person in a red shirt and blue jeans is installing a wooden pergola frame in a grassy backyard. The structure is partially assembled on a tiled base, surrounded by trees and greenery. Some wooden beams are lying on the ground nearby.TMB STUDIO

Step 7

Installing the beams

You’ll also need assistance to get the beams in place and clamped while you drill for the threaded rod. Start with the longer beams. Cut the 1/2-in. threaded rod to length with a hacksaw. Cut it 1/2 inch shorter than the measurement of two posts and the thickness of the beam. This will hide the rod ends, washers and nuts within the post.

Drill the countersink holes 1-1/4 inch deep into the posts. Then drill a 1/2-in. hole through the post, beam and the post on the backside. Drill very carefully so the bit comes out in the right location on the opposite side. You can buy a long bit at home centers. If you can’t find a long bit, you can buy a 1/2-in. spade drill bit and an extension. Slip a washer and nut on the end of the rod and drive it through with a hammer. Put a washer and nut on the side and tighten each side with a socket wrench.

Install the short beams the same way as the longer beams. These are fastened with just one steel rod. After the beams are in place, check to see if the posts are plumb using a level. If they need to be adjusted, install a 2×4 brace from the bottom of one post to the top of an opposite post, check for plumb again and nail it in place. Keep the brace in position until you’ve completed the roof.

A person in a red shirt is standing on a blue ladder using a level tool to check the alignment of a partially constructed wooden pergola in a garden. The structure consists of large wooden beams secured together with bolts, and there is greenery in the background.TMB STUDIO

Insert the threaded rods after drilling a countersink hole and a pilot hole. The countersink hole will recess the threaded rod, washers and nuts.

Position the notched stringers between the beams. You can bend 16d nails over as shown to hold them in place, then drill and insert the lag screws.

A person in a red shirt stands on a ladder, constructing a wooden outdoor structure in a grassy area with trees. The incomplete structure consists of large, light-colored beams and posts, forming a frame.TMB STUDIO

Step 8

Framing the roof

Install the double 2×6 interior stringers. These stringers provide extra support as the roof pushes out against the beams. Nail the stringers together (avoid the center area) with 10d galvanized common nails, then notch the centers of each. Fasten them flush with the top, and center each beam using two 5 x 1/2-in. lag screws.

Cut two longer hip rafters to the dimensions shown in Fig. C and fasten them together at the top with two 3-in. galvanized deck screws. Grab a partner and walk the rafter assembly up the ladders and nail it to the beams with four 10d galvanized common nails (two nails per side). Be sure the hip rafters fall directly over the intersections of the beams at the corners.

Next, cut the two remaining hip rafters; these are 3/4-inch shorter at the top than the other pair to make up for the thickness of the rafters already installed. Nail each of these to the pair of hip rafters.

Cut the four common rafters. You’ll notice in Fig. C that they have cheek cuts on the top. These 45-degree cuts on each side allow the common rafters to fit against the hips tightly. Nail them at the center of the beam and at the top.

Next, cut the jack rafters. These rafters have a compound cut at the top, as shown in Fig. C. Four of them are right-sided, and four are left-sided. Nail them to the beam and to the hip rafter with three 8d galvanized common nails.

Now it’s time to cut the 2×8 fascia boards (Fig. A) and nail them to the rafter tails with 16d galv. common nails. You’ll need to tail them so 3/4 inch of each rafter is above the inside edge of the fascia. This will allow the roof decking to sit flat on the rafters’ tops and the fascia’s outside edge.

Two people are constructing a wooden shed frame outdoors. The frame consists of vertical and horizontal beams forming the structure's skeleton. One person on a red ladder and another on a blue ladder work on attaching pieces. TMB STUDIO

Position the first set of hip rafters onto the beams. Get some assistance because this can be awkward. The hips should fall directly over the intersections of the beams.

Nail the jack rafters to the beams and hip rafters. Use 8d galvanized nails when nailing the jack rafters into the hip rafters.

A person in a red shirt stands within a partially constructed wooden structure outdoors. They are holding a yellow hammer and appear to be focused on the construction task. The framework suggests the structure will be a small building or shed. Trees and grass are visible in the background.TMB STUDIO

Step 9

Decking and shingling the roof

Our design uses 12-ft. pieces of 5/4 cedar decking for the roof deck because it’s great looking from the inside and thick enough to keep the shingle nails from poking through. Starting at the bottom, place the first board so it hangs over the fascia 1-1/4 inches. Nail the decking into the rafters with 8d galvanized common nails. Place the nails carefully because you’ll be able to see any goofs from inside the pavilion. Push the boards together so there aren’t any gaps between courses.

Once you’ve finished decking, staple 30-lb. roofing felt over the decking. We used No. 2 cedar shingles on the roof. They have a few knots but are rustic and add some charm to the structure. Your first row of shingles will be an underlayment for the first course. Let them hang beyond the bottom of the roof deck 1/2 inch. Then, nail shingles directly over this course, making sure to offset the seams with the underlayment course. Use 3d galvanized box nails. Start the next course 5 in. above the first. You can have an even reveal or stagger the shingles.

Staggering them randomly gives a more hand-built look. Complete each side and trim the shingles as you go with a fine-toothed plywood blade in your circular saw. You can also shave the edges to fit with a utility knife of plane. To finish off the seams above the hips of the roof, use preassembled cedar roof caps, which are sold at lumberyards.

Finally, sealing the entire pavilion with a deck sealer is a good idea. This will keep the shingles, beams and posts from cracking in the sun. After two of three months, check the bolts, nuts and lag screws. As the wood dries and shrinks, they may need tightening.

A person stands on a ladder while working on a wooden pergola, adjusting one of the rafters. The pergola's roof is partially assembled. The scene is set in a garden with green grass and tall trees in the background. The person wears a red shirt and blue jeans.TMB STUDIO