5 Remodeling Tips for a Finished Garage

Updated Nov. 29, 2023

Convert your drafty, dingy, spider-infested garage into a bright, comfortable work space

1 / 5

Add Blocking And Framing
Family Handyman

Add Blocking and Framing

Most rough-framed garages aren’t ready for drywall. Yours may be missing studs at the corners and attachment points for the ceiling drywall.

To see where framing members may be missing, inspect inside corners where walls meet, and where the walls meet the ceiling. These are the most common areas needing additional framing.

While the framing is accessible and you have your carpentry tools out, you may want to add other framing or structural elements. Here’s a list of possibilities:

  • Add blocking between studs for attaching shelving.
  • Nail blocking between ceiling trusses for hanging lights, cord reels or bicycle hooks.
  • Frame an opening for an attic access hatch.
  • Frame a ceiling opening for a drop-down attic ladder.
  • Cut a hole and frame an opening for a through-the-wall air-conditioning unit.
  • Add windows or skylights.

Add blocking at top plate

Don’t wait until you’re hefting a sheet of drywall overhead to discover missing blocking. Inspect the framing around the perimeter to see where more support is needed before you lift the drywall. Nail 2x4s to the top plate on the end walls if necessary.

Add blocking at house walls

Check the drywall on the house side for missing blocking. Mark a line by spanning the bottom of the trusses with a straight 2×4 at each end of the wall. Chalk a line between the marks and screw a 2×4 to the wall studs along the line.

2 / 5

Reroute Wiring and Add Outlets
Family Handyman

Reroute Wiring and Add Outlets

CAUTION: Turn off the power before working on wiring.

We had to reroute phone wires, door opener control wires and plastic-sheathed cable in our garage. Remove surface-mounted wiring and move it into the stud space, or reroute it over the top of the ceiling joists or trusses.

You may have to drill holes through studs or through the top plate of walls. If so, be sure to center the holes on the stud. If the plastic-sheathed cables are too short to reach the next box when you reroute them, add a junction box and splice on a length of cable. The new box must be accessible in the attic space or through a blank cover on the wall or ceiling.

This is also a good time to add outlets, lights and even another 20-amp circuit for power tools.

Call the local building inspections department to get a permit before you add or change wiring, and have the wiring inspected before you cover it with drywall or insulation. Not up for doing the wiring yourself? Extra outlets and good lighting are well worth the cost of hiring an electrician.

Move surface-mounted wire

Disconnect wiring that will interfere with hanging the drywall. First, shut off the power. Then disconnect the cable at the nearest electrical box and use side-cutting pliers to carefully pry out the staples.

Run wires

Reroute wiring through stud spaces or through the attic. Secure the sheathed cable with cable staples every 4-1/2-ft. and within eight inches of electrical boxes.

3 / 5

Ventilate And Insulate garage
Family Handyman

Ventilate and Insulate

An insulated, finished garage will stay cooler in the summer and warmer in the winter.

First, be sure the attic is well-ventilated. Check to see how many attic and roof vents you have. In general, you’ll need one square foot (144 sq. in.) of vent opening per 300 sq. ft. of attic, divided between the soffit and roof vents. For a typical 20- by 22-ft. garage, you’ll need about six 4-in. by 12-in. soffit vents and two standard square roof vents.

Install air chutes

Make sure your ventilation is effective by installing vent chutes between the trusses. Vent chutes have a channel that prevents blown insulation from blocking the airflow from the soffit vents to the attic space.

Plug the area under the vent with wood blocking or plastic and a chunk of fiberglass insulation. This prevents wind from blowing up through the insulation, or insulation from filling the soffit.

Add a vapor barrier

Protect walls from interior moisture and reduce air leaks with poly sheeting. Overlap corners, being careful not to create a “bridge” that would interfere with the drywall. Use only enough staples to hold the poly while you install the drywall.

We recommend filling the stud spaces with friction-fit fiberglass batts, covering the walls and ceiling with a 4-mil poly vapor retarder, and blowing insulation (cellulose is a good choice) into the attic after installing the ceiling drywall.

Start by insulating the walls. Buy unfaced R-13 batts for 2×4 walls and unfaced R-19 batts for 2×6 walls. Match the width of the batt (15-1/4-in. or 23-1/4-in.) to the stud space. Cut batts carefully for a tight fit.

Next, staple 4-mil poly to the walls and ceiling. Embed the poly sheeting in the caulk around the perimeter of each piece to create an airtight seal. Seal the seams between sheets and seal the poly to electrical boxes with caulk or special sheathing tape. (It’s typically red and looks like packing tape.)

After installing the drywall on the ceiling, you can blow insulation into the attic. Home centers and some rental stores sell blow-in insulation and often offer a free or reduced-rate rental on the blower if you purchase insulation from them.

4 / 5

Weather Strip Doors And Windows
Family Handyman

Weather-Strip Doors and Windows

Install weather stripping

Seal out drafts (and bugs!) with garage-door weather stripping. This is an important part of a finished garage. You don’t want to do all this work only for the garage to be drafty or filled with pests.

Cut the strips to length and nail them into place. Press the weather strip against the door as you nail it to create a tight seal.

Leaky doors and windows let in uncomfortable drafts and increase heating and cooling costs. Check your garage service door to be sure it has good weather stripping and a threshold that seals tightly to the bottom of the door.

In most cases, if your service door is missing a threshold and weather stripping, it’s more efficient to replace the door with a new, weather-tight version. You can buy an inexpensive prehung metal exterior door at home centers and lumber yards.

The overhead garage door can be a big source of drafts and heat loss. Recently installed doors usually include a weather-stripped stop around the perimeter. But older doors may be lacking a weather strip.

Luckily, it’s an easy fix. Garage door weather stripping is available at home centers and hardware stores, and installation is straightforward. If your overhead door is uninsulated, search online for “garage door insulating kits.”

5 / 5

Finish Up With Drywall
Family Handyman

Finish Up with Drywall

Drywall is the easiest and most economical covering for your finished garage ceiling. Use 5/8-in.-thick drywall if your trusses or rafters are spaced 24 inches apart. We’ll show you a few tips to simplify drywall installation.

Before you install the drywall, temporarily remove the brackets that support the garage door tracks and opener. This will make it easier to install the 4-mil poly and ceiling drywall, resulting in a neater-looking job.

Start by carefully measuring and recording the position of the tracks and opener. Measure from the nearest wall and from the floor. Then close the garage door, lock it closed and unplug the opener to disable it.

Unscrew or unbolt the brackets that support the garage door tracks and remove them. Also, remove the garage door opener brackets and support the opener on a ladder.

It may be easier to entirely disconnect the opener and set it aside. Reinstall the garage door track brackets using a new section of angle iron on the ceiling. Attach each new ceiling angle iron with four 5/16-in. x 3-in. lag screws driven into the center of the ceiling joist, or into wood blocking that’s screwed to the adjacent ceiling framing.

Use a drywall lift

Save your back with a rented drywall lift. Just set the drywall on the lift, crank it up and jockey it into position. They’re available at most rental centers.

For ceiling work, load the sheet onto the lift vertically and then swivel the lift platform until the sheet is horizontal. Then crank the sheet to the ceiling while you roll it into position. The lift also works for walls.

Shorten the garage door bracket

Reattach the garage door tracks securely with a metal angle iron. Buy a short length for the ceiling. Then cut the sides to position the track in its original location.